A time-location chart is a graphical representation of a construction program against axes of time and location (distance). It is a communication tool for project management that is used to inform a team about what needs to be done and when, as clearly and efficiently as possible.
Most construction planning and scheduling is carried out using bar charts, also known as Gantt charts. These charts plot activities against time, making them useful for knowing what to do at a specific time, however, they do not show where the work is being carried out. For civil engineering projects such as pipelines, railways, tunnels and roads, or repetitive projects such as housebuilding or high-rise building, it can be beneficial to chart activities against time and location.
A Gantt chart plots time on the horizontal axis and activities on the vertical axis. In contrast, a time-location chart is much less fixed. Location (distance) is often plotted on the horizontal axis and time on the vertical, although it varies as to whether it runs from the earliest down to the latest date or vice versa. Typically, charts for road and tunnel projects start at the top and progress downwards; whereas projects for buildings and pipelines start at the bottom and progress upwards.
Activities are shown as a line or shape (boxes or symbols) in the main body of the chart, making it possible to view the activities that will be taking place in which location at any particular time. The geometrical shapes show the occupation of the site over time, and ensure that conflicting access can be detected visually. Different types of activity are identified by specific colours, fill patterns, line types or special symbols. A key is used to clarify what the different symbols represent.
The advantage of a time-location chart is that it illustrates all visible activities along a construction site on a single chart. However, care must be taken not to include too much detail, as clarity can be lost in place of complexity, moving away from the purpose of the chart which is to make the construction programme easily understandable.
[edit] Related articles on Designing Buildings Wiki
- Activity schedule.
- Construction management.
- Contractor’s master programme.
- Critical path method.
- Design web.
- Gantt chart.
- Key performance indicators.
- Line of balance (LOB).
- Milestones.
- Pareto analysis.
- Programme float.
- Programme for building design and construction.
- Project programme.
- Resource management.
- Scheduling construction activities.
- Time management of construction projects.
Featured articles and news
Ebenezer Howard: inventor of the garden city. Book review.
The Grenfell Tower fire, eight years on
A time to pause and reflect as Dubai tower block fire reported just before anniversary.
Airtightness Topic Guide BSRIA TG 27/2025
Explaining the basics of airtightness, what it is, why it's important, when it's required and how it's carried out.
Construction contract awards hit lowest point of 2025
Plummeting for second consecutive month, intensifying concerns for housing and infrastructure goals.
Understanding Mental Health in the Built Environment 2025
Examining the state of mental health in construction, shedding light on levels of stress, anxiety and depression.
The benefits of engaging with insulation manufacturers
When considering ground floor constructions.
Lighting Industry endorses Blueprint for Electrification
The Lighting Industry Association fully supports the ECA Blueprint as a timely, urgent call to action.
BSRIA Sentinel Clerk of Works Training Case Study
Strengthening expertise to enhance service delivery with integrated cutting-edge industry knowledge.
Impact report from the Supply Chain Sustainability School
Free sustainability skills, training and support delivered to thousands of UK companies to help cut carbon.
The Building Safety Forum at the Installershow 2025
With speakers confirmed for 24 June as part of Building Safety Week.
The UK’s largest air pollution campaign.
Future Homes Standard, now includes solar, but what else?
Will the new standard, due to in the Autumn, go far enough in terms of performance ?
BSRIA Briefing: Cleaner Air, Better tomorrow
A look back at issues relating to inside and outside air quality, discussed during the BSRIA briefing in 2023.
Restoring Abbotsford's hothouse
Bringing the writer Walter Scott's garden to life.
Reflections on the spending review with CIAT.
Retired firefighter cycles world to raise Grenfell funds
Leaving on 14 June 2025 Stephen will raise money for youth and schools through the Grenfell Foundation.
Key points for construction at a glance with industry reactions.